amos 913d3c367f Add the usable task catalog and admit batch 6 tasks
All 161 task packages, including the 21 batch 6 C++17 tasks that passed
gates 1/2, are now in Git. rollout.catalog builds docs/task-catalog.{json,md}
from the task packages, a fresh trace5 calibration (128/128 PASS), every
verified controller receipt on the current task digest, documented holds
and digest-bound difficulty reviews. 123 tasks are usable (6 HARD),
5 are on hold and 33 still need a subprocess-only grader.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 17:43:15 +08:00

24 lines
1.1 KiB
C++

#include "overlay_internal.hpp"
namespace overlay_relocation {
int apply_overlay(const Tree& base, const Tree& overlay, Tree& output) {
output = Tree{};
detail::Budget combined;
detail::Catalog base_index;
detail::Catalog overlay_index;
if (!detail::input_tree(base, base_index, combined) ||
!detail::input_tree(overlay, overlay_index, combined)) return invalid;
if (!detail::base_catalog(base_index) || !detail::overlay_catalog(overlay_index)) return invalid;
std::vector<detail::Patch> patches;
if (!detail::collect_patches(overlay_index, patches)) return invalid;
detail::Nodes working;
if (!detail::relocate(base_index, overlay_index, patches, working)) return invalid;
std::map<std::string, std::string> targets;
if (!detail::fragment_targets(base_index, overlay_index, working, targets)) return invalid;
detail::Nodes merged;
if (!detail::merge(base_index, overlay_index, working, targets, merged)) return invalid;
output = detail::output_tree(merged);
return ok;
}
} // namespace overlay_relocation