Same-project saves queued behind one project lock. Add default-off record stripes while deletion, authorization and claim operations retain exclusive protection across all stripes. Require a complete barrier rollout before striped activation. Verify local Mongo deletion, revocation, crash recovery and two 100-user HTTP runs with save p95 below 400ms.
User: 「shift 左右能改变切片或标注动作的边界…这个也没有做」. The global map
returned null for every shift+arrow outside the panel (line ~68), and in
continuousActions mode the early adjust-boundary return fired regardless of
whether an action editor was open — startBoundaryHold then silently no-oped
without editingAnnotation, so the key looked dead in both shapes.
- annotation-shortcuts: shift+arrows in annotate phase now resolve to
coarse-nudge-boundary unless (continuousActions && actionEditor) keeps the I3
action-boundary binding; slice-phase behaviour unchanged either way; repeats
consume; modifiers still fall through natively.
- workbench dispatch: coarseNudgeSliceBoundary nudges the selected slice's
boundary 0.5s (selectedBoundary if one was clicked/dragged, else the panel's
default-focus rule: selected slice end, last slice falls back to start) and
commits through onSliceBoundaryChange — the same committed pipeline the slice
phase uses (clean → immediate apply, conflict → the ticket 04 list,
Esc = nudge never happened).
- help table: new annotate row for the slice-boundary nudge; the continuous
context relabels it to the dual semantics; the old continuous extra row is now
slice-phase only.
- keyboard guide: the committed-nudge paragraph and the panel prerequisites
(drafts no longer block opening; apply still requires them) updated.
Tests: annotation-shortcuts (new dispatch matrix incl. no cross-talk with the
panel table, editable inert, modifiers) + continuous-shortcuts pins updated to
the actionEditor-aware contract.
R1-Q8/R2-Q7 (spec slice-edit-ux-rework, seam ②):
- planQualityReviewDecision now builds the next rework baseline as
unresolved prior opinions (same entry IDs, QC still-problem notes
merged into the original text) followed by this round's new opinions;
resolved opinions never enter the new baseline
- rework-baseline reads (any round) and the acceptance source-opinions
baseline projection narrow to unresolved-only via the frozen round's
review confirmations; frozen records stay untouched (B02)
- legacy fallback: missing confirmations mean unresolved and opinions
keep carrying (documented + tested); missing prior baseline keeps the
first-round fresh-only behavior
- ADR 0008 records the decision, consequences and the rejected
collapsed-display alternative
One command now rebuilds TWO tasks sharing the org/accounts: task A
(unchanged, round-1 rework returned to the annotator) and new task B
on a second ise-demo-b-* capture driven through the full loop — first
submit, QC 8 opinions, reject, partial rework via real endpoints
(split S1 @15s, discard S3 via dictionary reason, act-07 description,
act-13 invalid), resubmit ending round-2 submitted awaiting QC
re-review with structureChangeSummary split=1/discarded=1. Deliberately
unresolved act-17, both timepoints and the overall opinion keep the QC
receive view red/gray mixed out of the box. Walkthrough §0 becomes a
two-task table and case-2 points at task B directly (manual path via A
kept as an optional note).