droboticflow/docs/verification/recent-integration.md

16 lines
1.8 KiB
Markdown

# Recent work integration
Integration worktree: `local-data/worktrees/recent-integration`, branch `codex/recent-integration`, based on `origin/dev@5d1135a0`.
Merged branches:
- `codex/acceptance-capacity-120@856b0617`: includes production/quality dashboards, polling optimization, acceptance navigation and opinion forwarding, static compression, and minimal UI copy rules.
- `codex/source-gate-pool-search@63714753`: source admission and explicit recovery, intake validation, authorized review pool search and pagination.
Original worktrees are retained. Uncommitted edits in other worktrees and legacy release checkouts are not imported. No push, PR, deployment, production source repair or resource change was performed.
Conflict resolution keeps both request cancellation and independent review cursors, both workspace styles and acceptance components, and specific source-validation errors. The authorization route snapshot is regenerated from the merged implementation.
Integration checks: TypeScript/architecture and 29 pagination/search tests passed. Frontend gate has 13 known failures, no new failures. Go gate passed with 68 existing failures and no new failures. Both real-browser fixtures passed (source recovery 11.75 s, pool search 11.30 s). Format, frontend production build and production boot passed. No known-failure baseline was changed. Initial missing Husky failure came from linking the stale root dependency directory; the integration now uses the same dependency directory as both source branches, and the frontend gate passed after correction.
Logs: `local-data/verification/`. Prior source branch evidence and limitations remain applicable: Docker clock jumps affected repeated Mongo validation; 120-person complete work, eight-hour soak and node failover remain unaccepted. This merge does not constitute production acceptance.